As a result of an effective investment policy supported by a qualified workforce, productivity at the terminal has risen constantly every year, making MPS Terminal one of the most efficient terminals in Africa.
Port of Tema, Ghana
MPS Terminal (container terminal)
Technical specifications of MPS terminal
- Total wharf length: 574 m
- Draught: - 11,5 m
- Container yard: 24 ha
- Equipment - STS (Ship to shore gantries): 5 / MHC (Mobile harbour cranes): 3 / RTG (Rubber Tyred Gantries): 9 / Reachstackers: 19
- Terminal Operating System: Navis N4
- 274 areas dedicated to refrigerated containers (reefers)
- Annual capacity: 1,200,000 TEUs
- Full container storage capacity: near 20,000 TEUs
Informations service
- Loading and unloading operations: 8:00 a.m. – 5:00 p.m. Monday to Friday / 9:00 a.m. – 2:00 p.m. Saturday / closed on Sundays
- Berthing: 24/7
- No shipping or navigation restrictions
- Container reception: open 72 hours before scheduled arrival of ships
Development of MPS2, Ghana
- Total wharf length: 1,400 m
- Draught: -16 m
- Container yard: 660 ha
- Equipments - STS (Ship to shore gantries): 10
- Annual capacity: 2,000,000 TEUs
Focus on the port of Tema
- Length of general cargo wharf: 1,920 m
- Installations for port supplies, ship waste water treatment service